Corvallis deck replacement on NW Roosevelt: full teardown and rebuild with PT framing, joist tape, Trex decking and railing, plus new siding and flashing.

Scope
Complete deck teardown and rebuild - PT framing, joist tape, Trex decking and railing, new house wrap, siding, and flashing
Corvallis deck replacement - finished Trex entry deck with composite railing and stairs at a NW Roosevelt home, built by West Over Woods Construction

Most deck replacements start with a phone call about the deck. This one should have started with a phone call about the siding.

The homeowners on NW Roosevelt in Corvallis had an entry deck that had reached the end of its life - the structure that everybody walks across to reach the front door. They wanted it gone and rebuilt right. Straightforward enough.

Then the old deck came off, and the wall behind it told a different story.


The Problem: What the Old Deck Was Hiding

Take a look at the demo photo. That band of exposed framing and foundation under the front door is where the old deck died into the house - and the siding across that whole section had gone bad.

This is the most common failure point on any deck attached to a home in the Willamette Valley, and the reason is boring physics. A deck ledger bolted flat to a wall creates a seam. Rain runs down the siding, hits that seam, and if there’s no flashing pushing it back out, it goes behind the siding instead. Then it sits there. Siding stays wet, house wrap fails or was never lapped correctly, sheathing follows, and the whole time the deck boards on top look perfectly fine.

Nobody sees it happen. You see it about ten years later, when somebody tears the deck off.

That’s the honest reason we don’t quote a deck replacement over the phone from a photo. Until the old structure is out of the way, nobody knows what’s behind it.


The Solution: Fix the Wall First, Then Build the Deck

The deck came out completely - decking, framing, footings, all of it. Nothing from the old structure got reused.

With the wall open, the sequence went like this:

New house wrap and siding. The compromised siding came off that section and got replaced. New weather-resistive barrier went on behind it, lapped correctly so water running down the wall stays on the outside of the wrap.

Flashing that actually diverts water. This is the part that keeps the repair from repeating itself in another decade. Flashing at the deck-to-wall connection is what turns a horizontal seam into a shingle - water hits it, gets pushed out past the face of the siding, and drips clear of the structure instead of running into it. A deck without it is a permanent leak with a two-by-ten holding it in place.

Oversized pressure-treated framing. Every framing member - ledger, beams, joists, stair stringers, posts - is pressure-treated lumber, sized up beyond the minimum. Decks bounce when they’re framed to the letter of the span table. This one doesn’t.

Joist tape over every single member. Here’s the step most contractors skip, and it’s the one we’d argue about if you asked us to leave it off. Before a board of decking goes down, the top edge of every joist, every beam, and the ledger gets covered with self-adhesive butyl flashing tape.

Why it matters: the top of a joist is where all the holes are. Every deck screw, every hanger nail, every fastener penetration is a little reservoir that collects water and holds it against end grain. Tape seals around the fastener as it drives through, so those holes never get wet. The framing stays dry, the fasteners don’t corrode, and the frame outlasts the decking sitting on it.

Nobody will ever see it. It’s under the deck boards forever. It’s also the difference between a frame that lasts fifteen years and one that lasts forty.

Trex decking and composite railing. The finish surface and the railing system are composite. On a front entry deck in Oregon - full weather exposure, constant foot traffic, and the first thing anybody sees walking up to the house - composite is the right call. No annual sanding, no re-staining, no boards to swap out because they cupped. Wash it and get on with your life.


Why the Sequence Matters More Than the Materials

Anybody can order Trex. The part that determines whether this deck is still solid in 2050 is the order the work happened in:

  1. Tear out completely - no reusing framing to save a day
  2. Open up the wall and find out what’s actually there
  3. Repair the siding and weather barrier
  4. Flash the connection so water leaves
  5. Frame heavy, in pressure-treated lumber
  6. Tape every top edge
  7. Then, and only then, put the pretty surface on

Skip step two and you build a beautiful new deck on top of a wall that’s rotting. It’ll look great for a decade. Then somebody like us tears it off and finds a much more expensive problem than the one that was there this time.


Thinking About Your Own Deck?

If your deck is more than fifteen years old, attached to the house, and you’ve never seen flashing at the wall, it’s worth having somebody look at it. Not necessarily to replace it - to find out what’s happening behind it while a repair is still a repair.

We build decks and fences across Corvallis, Albany, Philomath, and the Mid-Willamette Valley, and Mick is on every job from demo through the last railing post.

Call West Over Woods Construction at (541) 200-8035 or schedule an estimate. We’ll tell you straight whether you’re looking at a rebuild or a repair.

Before & After

The transformation

Drag the handle to compare

NW Roosevelt Corvallis Deck Replacement - Old Deck Demolished vs. Finished Trex Deck, after
NW Roosevelt Corvallis Deck Replacement - Old Deck Demolished vs. Finished Trex Deck, before
Before After
NW Roosevelt Corvallis Deck Replacement - Old Deck Demolished vs. Finished Trex Deck

NW Roosevelt Corvallis Deck Replacement - Old Deck Demolished vs. Finished Trex Deck

Project Photos

Inside the build

Siding removed at the entry after deck demolition, exposing the wall framing and foundation before new house wrap, siding, and flashing went on - NW Roosevelt, Corvallis
With the old deck gone, the damaged siding behind it came off too. New house wrap, siding, and flashing went on before a single joist was set.
Finished Trex deck and composite railing wrapping the front entry of a Corvallis home, viewed from the side
Composite railing and fascia wrap the whole platform - no exposed framing, nothing to repaint.
Completed deck replacement seen from the front lawn of a NW Roosevelt Corvallis home, with new stairs leading to the red front door
The finished entry from the street - the same view as the demo photo.

Services on this project

What this build pulled together

Frequently Asked

Questions about this project

Why cover the top of every framing member with joist tape? +

Every deck screw and every joist hanger nail is a hole in the top of a joist. In the Willamette Valley, water finds those holes, sits in them, and rots the framing from the inside out - long before the surface of the board looks bad. Self-adhesive butyl flashing tape over the top edge of each joist, beam, and ledger seals around every fastener as it's driven. It's an extra material and labor line on the estimate that nobody sees once the decking is down, and it's the single cheapest thing you can do to add decades to the life of the frame.

Why did a deck replacement turn into a siding job? +

Because of where the old deck met the house. That band of wall spent years behind a deck that was shedding water into it instead of away from it, and the siding there had gone bad. Building a new deck over failed siding would have hidden the problem, not fixed it. Once the old structure was out of the way, we pulled the damaged siding, put on new house wrap, re-sided that section, and installed flashing so water gets pushed out and away from the wall instead of running down behind it.

Is Trex worth it over pressure-treated decking? +

For most Corvallis homeowners, yes. Pressure-treated decking is cheaper up front and then charges you for it every year or two - cleaning, sanding, re-staining or re-sealing, replacing the boards that cupped or checked. Composite decking like Trex costs more on day one and then asks for a wash. On an entry deck that's in full sun and full rain and is the first thing anyone sees when they walk up, the maintenance math favors composite. The framing underneath is still pressure-treated lumber either way - that part doesn't change.

What does 'oversized framing' actually mean? +

It means the joists are deeper and the spacing tighter than the span tables strictly require. Code minimums are minimums - a deck built exactly to them is legal and will feel it, with bounce underfoot and more movement at the connections over time. Going up a size and closing the spacing costs a modest amount of lumber and makes the deck feel solid, which matters more on a small entry deck that every visitor walks across than on a big platform out back.

Mick Westover, Owner of West Over Woods Construction

About Mick Westover

Mick Westover has spent 25 years on the tools in the Mid-Willamette Valley, starting as a drywall and hardwood-flooring specialist on high-end residential and commercial jobs. He runs West Over Woods Construction (Oregon CCB# 241096) out of Corvallis, where he leads remodels, additions, and finish carpentry himself, top to bottom.

Mick is LEED certified, holds a dozen-plus OSHA safety certifications, and graduated from Oregon State with a Bachelor of Science in Construction Engineering Management. When he isn't on a job site, he's at home in Corvallis with his family, out hiking, or behind a camera somewhere in the Oregon outdoors.